P-1876

Phased In

Description

Financing

Documents

Photos

History Logs

Project Description

Country: USA

Location: Arlington

Total Budget: $6,000

Areas of Focus: Disease prevention and treatment, Maternal and child health, Basic education and literacy, Economic and community development

Activity Type: Community Development: General

Summary: Provide shelter and education for foster children/adults phasing out of foster care.


Phased IN is a transitional living program for emancipated foster youth. The goal of Phased IN is to assist these young adults in learning basic life skills that will prepare them for independent living. Phased IN will provide housing, education, medical care and life skills training. With the combined partnership of the Arlington Sunrise Rotary, the community, Phased IN will embrace these youth who were never adopted to ensure that these young adults achieve self-sufficiency and stability. Finally, Phased IN will provide the most vital and missing dynamic in the lives of these young adults - Family.


Addendum to Project Description (added after the project was signed)

We have run into an opportunity that we need to adjust the funding for the Phased In. We would like to amend the project to the required architecture fees and the asbestos removal required prior to beginning the remodel and allowing Phased In residents to take move into the building. Thank you. Chip May

Project Contact Person

District: 5790

Rotary Club of: Arlington (Sunrise)

Primary Contact: Chip May

Email: chip@mayfinsolutions.com

Project Status

Dropped
This project has been "Dropped". Check the history log entries to see why it was dropped.

Project listed for the 2017-18 Rotary Year.

Proposed Financing

Existing Contributions Towards This Project

Date

Cash

DDF

Total

Arlington (Sunrise) (5790)

13-Aug-17

$3,000

$3,000

$6,000

Total

$3,000

$3,000

$6,000

Project Supporting Documents


[20-Jun-18]
990


[20-Jun-18]
checks and receipts


[20-Jun-18]
project plan

 

Project Photos


There are no photos yet for this project.
Go to the administration page to upload photos.

History Log Entries

13-Aug-17

System Entry

System Entry: Creation of project page.

4-Nov-17

by Sharron Miles

System Entry: Project sent for club signatures.

4-Nov-17

by Sharron Miles

System Entry: Project signed by Sharron Miles.

2-Jan-18

by Chip May

Currently all activity is in the planning and coordination of re-modeling phased in facility awaiting city building permits approval. Meeting and planning activity is high with multiple meeting each month. Thank you, Chip May

2-Jan-18

by Chip May

System Entry: Project signed by Chip May.

15-Mar-18

by Sharron Miles

System Entry: Project approved by the District Approval Committee.

2-Jul-18

by Sharron Miles

System Entry: Project dropped by Sharron Miles.

Reason for dropping: RI would not approve the grant

© 2010 Philippe Lamoise - Website design by Philippe Lamoise, D2G Online