Need - The town generates 29 tons of waste every day. After composting and segregating the recyclable waste, 7 tons of waste remains as refusal, which need to be safely disposed of every day. These waste refusals are dumped in open space and are burnt in the open air. This spoils the environment, contaminates the water and pollutes the air, which results in a health hazard for the surrounding community and the health workers.
Objective - To help to dispose of the solid waste-refusal in a safe, scientific and non-hazardous way. And by that save the environment, groundwater and air; and also protect the public and sanitary workers from water contamination, air pollution and diseases.
Description of the project - This project will install Incinerator, air-pollution control unit, 30-meter height emission chimney, shredder, automated waste feeder, and conveyor system.
Outcome and the impact - More than 1,000 families and 20-30 health workers will be benefitted and their health will improve. Environment will be saved, water will be protected from contamination and the air will be un-polluted.
Sustainability - Tiruchengode Municipality has agreed to provide enough space to install the equipment, to take over the equipment and run and maintain them at their own cost. MOU will be entered into. It has enough tax revenue and government allocations to meet the recurring and maintenance expenses. Residue of the burnt waste refusal - ashes - will be sold to many of the ash brick manufacturers around.
The project will be completed before the end of June 2021.
The project funds will be used to install the equipment.
Members will identify proper equipment, proper place to install, negotiate and finalize the equipment, oversee its installation, ensure proper training, monitor the functioning and evaluate.
Paid
This project is "Paid". This means the funds have been received and the project is being implemented.
Project listed for the 2020-21 Rotary Year.
The TRF Grant application number is #2120594.
Proposed Financing
Existing Contributions Towards This Project
Date
Cash
DDF
Total
Tiruchengode (2982)
4-Nov-20
$10,000
$13,500
$23,500
Alamo (5160)
12-Nov-20
$11,000
$27,000
$38,000
District 6060 DDF
12-Nov-20
-
$1,000
$1,000
Cataraqui-Kingston (7040)
12-Nov-20
$1,500
$0
$1,500
Amount Requested from The Rotary Foundation
-
$41,500
$41,500
Total
$105,500
Note: as of July 1, 2015 there is a 5% additional support fee for cash contributions. This fee does not appear in the financials above because it does not apply if the funds are sent directly to the project account (without going through TRF, and therefore without Paul Harris credit). Clubs sending their cash contribution to TRF must be aware they will have to send an additional 5%.
System Entry: Pledge of $2,000 with $12,500 DDF by Shanmugasundaram of the Rotary Club of Tiruchengode, District 2982.
4-Nov-20
by Shanmugasundaram
System Entry: Pledge of $2,500 with $12,500 DDF by Shanmugasundaram of the Rotary Club of Tiruchengode, District 2982.
12-Nov-20
by Shanmugasundaram
System Entry: Pledge of $1,000 DDF by Todd Lindley of the Rotary Club of Missouri, District 6060.
12-Nov-20
by Shanmugasundaram
System Entry: Pledge of $1,500 by Bill Gray of the Rotary Club of Cataraqui-Kingston, District 7040.
12-Nov-20
by Shanmugasundaram
System Entry: Pledge of $1,500 by Dieter Brand of the Rotary Club of Medicine Hat, District 5360.
12-Nov-20
by Shanmugasundaram
System Entry: Pledge of $1,000 by Asoka of the Rotary Club of Salem Mid-Town, District 2982.
3-Jul-21
by Shanmugasundaram
System Entry: Project is now "Fully Pledged".
3-Jul-21
by Shanmugasundaram
System Entry: Project is now "Fully Pledged".
16-Jul-21
by Shanmugasundaram
System Entry: Application Sent to The Rotary Foundation through Member Access.
16-Jul-21
by Shanmugasundaram
System Entry: Application approved by The Rotary Foundation.
16-Jul-21
by Shanmugasundaram
System Entry: Payment has been issued by The Rotary Foundation.
7-Feb-22
by Shanmugasundaram
Application has been submitted to get environment clearance from the Government. The Municipal Administration is following up the matter closely; and we are also following it up. Hope to get the approval soon.
18-Aug-22
by Shanmugasundaram
the Municipal authorities have applied to the Pollution Control Board for clearance. Yet to receive the certificate. Once received, It will be implemented immediately.
3-May-23
by Shanmugasundaram
Applied for the Pollution control Board permission. Expecting to receive soon. Once it is received, the installation will be started.
19-Nov-23
by Shanmugasundaram
Applied for Pollution Control Board permission to install the unit. It is expected to get it soon. Once received, installation of the equipment would be initiated.
2-Jul-24
by Shanmugasundaram
the project is under implementation. Will be completed by 31 August 2024
11-Feb-25
by Shanmugasundaram
The project has been installed and the trials are taken. It's found that it needs an additional equipment, which has been ordered and will be completed within 15 days