Project Proposal: Enhancing Access to Clean Drinking Water in Palungtar, Nepal
1. Executive Summary
This project aims to improve access to clean drinking water in Palungtar, a rural region in Nepal, by constructing pipelines, establishing rainwater harvesting systems, and implementing water filtration systems. The project will involve the local community at every stage, ensuring sustainability and long-term benefits. By addressing water scarcity and quality issues, we aim to improve health, increase economic opportunities, and enhance the overall well-being of the rural population.
2. Background and Context
• Current Situation:
o Access to clean drinking water in Palungtar is limited, with many communities relying on unsafe water sources, leading to health issues such as waterborne diseases.
o Seasonal variations in rainfall and geographical barriers further complicate water access, especially during dry periods.
• Objective:
o To ensure that all households in Palungtar have reliable access to safe, clean drinking water.
• Target Population:
o Approximately [50] households in Palungtar, with a focus on marginalized and underserved communities.
3. Project Goals and Objectives
• Primary Goal:
o To provide sustainable access to clean drinking water in Palungtar by constructing pipelines, installing rainwater harvesting systems, and providing water filtration solutions.
• Specific Objectives:
1. Construct a network of water pipelines to connect homes to safe water sources.
2. Install water filtration systems to ensure water quality.
3. Train local communities on maintaining systems to ensure sustainability.
4. Raise awareness about the importance of clean water and hygiene practices.
4. Project Activities and Timeline
1. Planning and Design (Month 1-2):
o Survey the region to determine the most effective locations for pipelines and rainwater harvesting systems.
o Consult with local leaders and communities to ensure alignment with needs and preferences.
o Finalize project designs and obtain necessary permits.
2. Construction of Pipelines (Month 4-5):
o Begin construction of water pipelines to connect households to reliable water sources.
o Install necessary infrastructure, such as storage tanks, valves, and distribution points.
3. Water Filtration System Implementation (Month 5-7):
o Provide households with water filtration units for their individual use.
o Conduct training on proper use and maintenance of the filtration systems.
4. Community Engagement and Training (Ongoing, starting Month 3):
o Conduct training sessions for community members on system maintenance, water quality monitoring, and hygiene education.
o Establish community-based water management committees to oversee the long-term maintenance of water infrastructure.
5. Monitoring and Evaluation (Month 8-12):
o Conduct regular monitoring of the water systems to ensure functionality and sustainability.
o Collect feedback from the community to assess the project's impact on health and daily life.
5. Sustainability Plan
• Community Ownership:
o Form community-based water management committees to oversee the operation and maintenance of the infrastructure.
• Training and Capacity Building:
o Provide local leaders and community members with the skills to manage and maintain the systems effectively.
• Financial Sustainability:
o Implement a small user fee system (if feasible) to support ongoing maintenance.
• Collaboration with Local Authorities:
o Engage local governmental bodies to ensure continued support for the project after completion.
6. Budget Overview
Here's a general expenditure of the budget needed for the project. Estimated Cost USD 45000/-. We will breakdown the budget as bellow subject
Activity Estimated Cost (USD 45000/-.)
Planning and Design $X,XXX
Pipeline Construction $X,XXX
Transportations expenses $X,XXX
Water Filtration System Setup $X,XXX
Community Training and Education $X,XXX
Monitoring and Evaluation $X,XXX
Total Project Budget $XX,XXX
7. Funding Sources
To implement this project successfully, we will seek funding from multiple sources:
• Local Rotary Clubs: Support for initial phases and community involvement.
• Global Rotary Clubs: For larger-scale funding, particularly for the infrastructure components.
• NGOs and Governmental Organizations: To support technical and educational aspects, as well as long-term sustainability.
8. Expected Outcomes and Impact
• Health Impact:
o Reduction in waterborne diseases and improvement in overall health.
• Economic Impact:
o Increased productivity due to better health and access to clean water.
• Social Impact:
o Empowerment of local communities through active participation in the project.
• Environmental Impact:
o Sustainable water management practices, reducing the overuse of local water sources.
9. Conclusion
This project represents a significant opportunity to improve the quality of life for communities in Palungtar, Nepal, by addressing the critical issue of water access. By combining sustainable solutions, local engagement, and collaboration with various stakeholders, we can ensure that the project will have a lasting and positive impact on the community.
|